All links and images are annotations added to the original Senate OPR data by Tech Inquiry.
Any normalized names are clearly labeled with the original
('as written') text.
All links and images are annotations added to the original Senate OPR data by Tech Inquiry.
Any normalized names are clearly labeled with the original
('as written') text.
All links and images are annotations added to the original statewide contracts list by Tech Inquiry.
Any normalized names are clearly labeled with the original
('as written') text.
All links and images are annotations added to the original NLRB data by Tech Inquiry.
Any normalized names are clearly labeled with the original
('as written') text.
* The total 'potential' contract value figure requires the most care -- and, ideally, manual analysis -- as there can be double-counting between the potential value of a parent award (e.g., an Indefinite Delivery Contract) and one of its subawards (e.g., a Delivery Order). But, due to disk space constraints, we cannot store all contract information and have only uploaded subaward linkages back to mid-2019. For this reason and others, for the sake of consistency we compute the sum of the potential contract values in the naive manner with the understanding that it is usually only a slight overestimate of a number which is, even when carefully computed, often a very loose upper bound on eventually exercised options values.
Retrieved and analyzed 360 but only displayed
250.
All links and images are annotations added to the original FPDS ATOM Feed by Tech Inquiry.
Any normalized names are clearly labeled with the original
('as written') text.
THE PURPOSE OF THIS MODIFICATION IS TO ADD WORK BASED ON UNFORESEEN CONDITIONS AT NORTH MOORINGS UNDER CLIN 00001, AND AT SOUTH MOORINGS UNDER CLIN 00002. DESCOPE 126 PURLINS NOT REQUIRED (CREDIT) TO THE CONTRACT LINE ITEM 00001.
REPAIR KARS PARK I. THE PURPOSE OF THIS MODIFICATION IS TO ADD TRACKING NUMBER (TN)06 & TN07. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $9,159.96 AND PERIOD OF PERFORMANCE EXTENDED TO JAN 11, 2021.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA. TN 08A SHOWN BELOW. MODIFICATION INCORPORATES TRACKING NUMBER 08 AND INCREASES CONTRACT VALUE $288,868. THE PERIOD OF PERFORMANCE IS EXTENDED TO 02/20/2021.
PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND TRANSPORTATION FOR THE COMPLETE FABRICATION, DELIVERY, CONSTRUCTION, AND FOUNDATION DESIGN OF THE FOLLOWING STRUCTURE: LIGHT LIST NUMBER (LLNR 95)PORT ST. JOSEPH BAY A RRL
KARS PARK REPAIR (PCN 99274). MODIFICATION INCORPORATES TRACKING NUMBERS 02,03,04 AND 05. CONTRACT PRICE IS INCREASE $116,328.06. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA. THIS IS AN ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FROM 7/30/20 TO 12/30/20 FOR FUTURE INCLUSION OF TRACKING NUMBER 08 AND FINAL CLOSEOUT.
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER. MODIFICATION TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FROM 8/31/20 TO 9/30/20 DUE TO COVID-19
FACILITY SHUT DOWN. THE CONTRACT VALUE REMAINS UNCHANGED.
REPAIR KARS PARK I. ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FROM AUGUST 25, 2020, TO DECEMBER 15, 2020, DUE TO THE COVID-19 PANDEMIC.
PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND TRANSPORTATION FOR THE COMPLETE FABRICATION, DELIVERY, CONSTRUCTION, AND FOUNDATION DESIGN OF THE FOLLOWING STRUCTURE: LIGHT LIST NUMBER (LLNR 95)PORT ST. JOSEPH BAY A RRL
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER. MODIFICATION TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FROM 5/13/20 TO 8/31/20. THE CONTRACT VALUE REMAINS UNCHANGED.
INSTALL NEW FIRE ALARM CONTROL PANEL (FACP) AT THE COMPRESSED AIR BUILDING (J7-0338), AT LAUNCH PAD B. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACT COMPLETION DATE FROM MAY 29, 2020 TO APRIL 30, 2021 FOR THE GOVERNMENT'S CONVENIENCE.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA . ADMINISTRATIVE MOD EXTENDS PERIOD OF PERFORMANCE TO 7/30/20 PER RESTRICTED ACCESS TO KSC DUE TO CORONAVIRUS SITUATION.
MAJOR REPAIRS AT USCG SECTOR ST. PETERSBURG, NORTH MOORINGS AND SOUTH MOORINGS, AND ROOF REPAIRS AT DAVIS ISLAND, FLORIDA
THE CONTRACTOR SHALL PERFORM THE CLEANUP REQUIREMENTS UNDER PSN 14603552 CHILD ACM CLEAN UP OF WINDJAMMER CLUBHOUSE.
INSTALL FIRE ALARM CONTROL PANEL AT THE COMPRESSED AIR BUILDING AT KENNEDY SPACE CENTER. MOD 3: THIS MODIFICATION INCORPORATES CLAUSE NFS 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015). THE CONTRACT COMPLETION DATE IS CHANGED 5/29/2020.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 11: THIS ADMINISTRATIVE MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE TO 4/30/2002 AS TRACKING NUMBER: OBA IS IN THE PROCESS OF BEING NEGOTIATED.
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER. MOD 4: PROVIDES FUNDING FOR INSULATION (RFI 4) AND RECONFIGURE RISERS (RFI 05) AS DESCRIBED IN TRACKING NUMBER 02 AND EXTENDS THE PERIOD OF PERFORMANCE.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 10: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 1/31/20 TO 2/28/20. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER (KSC), FLORIDA MOD 2: THIS IS AN ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO 02/28/2020 AS TN02 IS CURRENTLY BEING COMPLETED.
INSTALL NEW FIRE ALARM CONTROL PANEL (FACP) AT THE COMPRESSED AIR BUILDING (J7-0338) AT LAUNCH PAD B PCN: 99244. MOD 2: MODIFICATION REDUCES TOTAL CONTRACT VALUE BY $2,401.57 DUE TO A NEGOTIATED SETTLEMENT OF CHANGE IN THE ORIGINAL SCOPE OF WORK.
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER (KSC), FLORIDA MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 1/31/20. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 9: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 12/27/19 TO 1/31/20. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. THE PURPOSE OF THIS MODIFICATION IS TO CORRECT COMPLETION DATE IN PPS FOR CONTRACT ORDER 80KSC17C0014 "REPLACE ROOFS AT VARIOUS FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166: 1. OSB LL BALCONY DOOR WEATHER STRIP
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE REMAINS 1/15/2020.
THE PARTIES REACHED AGREEMENT ON TN-12 OSB II BALCONY DOOR WEATHERS STRIP HEREBY INCORPORATED INTO THE CONTRACT AT $ 2.807. AS A RESULT THE CONTRACT PRICE IS INCREASED BY $2,807 FROM $3,711,658.74 TO $3,714,465.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE REMAINS JANUARY 15, 2020. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE NEGOTIATED CHANGES FOR TN 12 THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THIS CHANGE.
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE TO L/15/2020 SO THE PARTIES CAN COMPLETE ADMINISTRATIVE ACTIONS.
KARS PARK SHORELINES AND VARIOUS DOCKS MOD 7: THIS MODIFICATION INCREASES THE CONTRACT VALUE BY $157,644.63 AND EXTENDS THE PERIOD OF PERFORMANCE TO 12/31/19.
KARS PARK SHORELINES AND VARIOUS DOCKS MOD 7: THIS IS AN ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO 12/4/19 AS TRACKING NUMBERS 08A AND 10A ARE IN THE PROCESS OF BEING NEGOTIATED.
KARS PARK SHORELINES AND VARIOUS DOCKS MOD 6: REPAIR TURN BASIN HURRICANE IRMA THE CONTRACT PRICE IS INCREASED BY $2,041.28, FROM $2,080,744.42 TO $2,082,785.70. THE PERIOD OF PERFORMANCE WILL BE EXTENDED THROUGH 11/04/19.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA. THE PURPOSE OF THIS MODIFICATION IS TO:
REPAIR KARS PARK SHORELINES AND VARIOUS DOCKS (PCN 99202) AS DESCRIBED IN TN07A (SEE ATTACHED). AS A RESULT THE CONTRACT PRICE IS INCREASED BY $9,002.36, FROM $2,071,742.06 TO $2,080,744.42. THE PERIOD OF PERFORMANCE WILL BE EXTENDED FROM 10/2/19 THROUGH 10/24/19.
REPLACE ROOFS AT VARIOUS FACILITIES MOD 13: THE PURPOSE OF THIS MODIFICATION IS TO ADD TRACKING NUMBER (TN)#11 ASBESTOS TESTING OSB II WINDOWS CAULKING IN THE AMOUNT OF $1,719.00 AND TO CHANGE THE COMPLETION DATE TO 12/5/19. **PLEASE NOTE THAT THESE CHANGES ARE LISTED ON THE SF30 AS MOD 13 BUT ENTERED IN THE PROCUREMENT FOR PUBLIC SECTOR (PPS) SYSTEM AS MOD 14.
INSTALL NEW FIRE ALARM CONTROL PANEL (FACP) AT THE COMPRESSED AIR BUILDING (J7-0338) AT LAUNCH PAD B AT KENNEDY SPACE CENTER, FL, PCN: 99244 MOD 1: IN ACCORDANCE WITH FAR 52.242-14 SUSPENSION OF WORK, INTEGRATED CONSTRUCTION MANAGEMENT INC., IS REQUESTED TO SUSPEND ALL WORK UNDER CONTRACT 80KSC018C0048 UNTIL FURTHER NOTICE DUE TO GOVERNMENT DELAYS. THIS WORK INCLUDES ANY WORK PERFORMED BY SUBCONTRACTORS. SUBMISSION OF SHOP DRAWINGS AND SUBMITTALS, ORDERING OF APPROVED MATERIALS AND PERFORMANCE OF SURVEYING AND LAYOUT OF THE JOB SITE WILL CONTINUE TO BE PERMISSIBLE.
PERIOD OF PERFORMANCE: SEPTEMBER 25, 2018 TO JANUARY 23, 2019
REPLACE ROOFS AT VARIOUS FACILITIES MOD 13: THE PURPOSE OF THIS MODIFICATION IS TO ADD FAR CLAUSE 52.222-62 PAID SICK LEAVE. **PLEASE NOTE THAT THIS CHANGE IS LISTED ON THE SF30 AS MOD 13 BUT ENTERED IN THE PROCUREMENT FOR PUBLIC SECTOR (PPS) SYSTEM AS MOD 14.
MODIFICATION PURPOSE TO MAKE ADMINISTRATIVE CHANGES, TO ADD ADDITIONAL FUNDING RELATED TO A CHANGE IN DB WD AND TO ESTABLISH THE PERIOD OF PERFORMANCE.
Place of Performance
CANAVERAL AIR STATION, FLORIDA 329251801 UNITED STATES
REPLACE ROOFS AT VARIOUS FACILITIES, REPLACE ROOF AT OSB IL, PCNS: 99164&99166: MOD 12:
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING:
I. OSB II CAULKING AND INSTALLATION OF FRENCH DOOR
2. REQUEST FOR EQUITABLE ADJUSTMENT #2 FOR AIR MONITORING AND ASBESTOS WORK PLAN;
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 10/6/2019.
AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $36,328 FROM $3,673,611.74 TO
$3,709,939.74.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 4:
REPAIR KARS PARK SHORELINES AND VARIOUS DOCKS (PCN 99202), AS DESCRIBED IN TN04, TN05 AND TN06. TN 04 REPLACE DOCK PILES. CONTRACT VALUE INCREASED BY $7,263. TN 05 EMERGENCY REPAIRS TO SHORELINE ALONG AUDUBON RD. INCREASE CONTRACT VALUE BY $5,356. TN 06 SOD RV PADS. DECREASE CONTRACT VALUE BY ($67.98) AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $12,551.14, FROM $2,059,190.92 TO $2,071,742.06. B. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
REPAIR ROOFS, VARIOUS FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166: MOD 11: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING:
L. REQUEST FOR EQUITABLE ADJUSTMENT (REA) GOVERNMENT'S SHUTDOWN;
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 7/8/2019.
THE PARTIES REACHED AGREEMENT ON REA #1 (GOVERNMENT'S SHUTDOWN) WHICH IS HEREBY INCORPORATED INTO THE CONTRACT FOR THE TOTAL AMOUNT OF $2,732. AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $2,732 FROM $3,670,879.74 TO $3,673,611.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED TO JULY 8, 2019. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE NEGOTIATED CHANGES FOR REA #1, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THIS CHANGE.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 3: THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THIS CONTRACT AS FOLLOWS:
A. TUM BASIN SHORELINE HURRICANE IRMA REPAIRS (PCN 99202) AS DESCRIBED IN TN02 (SEE ATTACHED).
B. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
C. STATEMENT OF RELEASE
IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CONTRACTOR'S. TN02, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL
LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE THESE PROPOSALS.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THIS CONTRACT AS FOLLOWS: TURN BASIN SHORELINE HURRICANE INNA REPAIRS (PCN 99202) AND TRANSPORT&SCREEN BALLAST FROM DARCY TO KARS PARK. CONTRACT VALUE INCREASED BY $56,045.00. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $56,045, FROM $1,896,105.92 TO $1,952,150.9.2 THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
REPLACE AIR HANDLING UNIT 11, OPERATIONS SUPPORT BUILDING (OSB) II AT KENNEDY SPACE CENTER (KSC), FLORIDA MOD 1: THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THIS CONTRACT AS FOLLOWS:
A. IN ACCORDANCE WITH TN0L, INTEGRATED CONSTRUCTION MANAGEMENT, INC. (ICMI) WILL PROVIDE AN
INSTALLED PIPE CABINET. B. INSTALLATION OF PIPE CABINET AS DESCRIBED IN TN0L TN 01 SHOWN BELOW. CONTRACT VALUE INCREASED BY $11,300. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $11,300, FROM $466,118 TO $477,418. THE PERIOD OF PERFORMANCE WILL BE EXTENDED TO DECEMBER 27, 2019.
KARS PARK SHORELINES AND VARIOUS DOCKS - REPAIR TURN BASIN HURRICANE IRMA MOD 1: THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THIS CONTRACT AS FOLLOWS:
A. TUM BASIN SHORELINE HURRICANE IRMA REPAIRS (PCN 99202) AND THE OPTION, AS DESCRIBED IN TN0L (SEE ATTACHED).
-TN 01 SHOWN BELOW. CONTRACT VALUE INCREASED BY $213,487.
-AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $213,487, FROM $1,682,618.92 TO $1,896,105.92.
B. THE PERIOD OF PERFORMANCE WILL BE EXTENDED 60 DAYS, FROM AUGUST 3, 2019 TO OCTOBER 2, 2019.
C. STATEMENT OF RELEASE
IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CONTRACTOR'S. TN0L, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL
LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE THESE PROPOSALS.
REPAIR ROOFS, VARIOUS FACILITIES MOD 10: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSC17C0014: 1. INCORPORATE TN 9 VAB CAULKING REPAIRS;
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 5/30/2019. AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $118,029.00.
OSB II CANOPY INSULATION, FLASHINGS AND SCUPPERS ROOF REPAIRS. MOD 9: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING: INCORPORATE TN 8 OSB II CANOPY INSULATION, FLASHING AND SCUPPERS ROOF REPAIRS. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED TO 3/21/19. AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $50,594 FROM $3,502,256.74 TO$3,552,850.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED TO MARCH 21, 2019.
INSTALL NEW FIRE ALARM CONTROL PANEL (FACP) AT THE COMPRESSED AIR BUILDING (J7-0338) AT LAUNCH PAD B AT KENNEDY SPACE CENTER, FL, PCN: 99244
PERIOD OF PERFORMANCE: SEPTEMBER 25, 2018 TO JANUARY 23, 2019
REPLACE ROOFS AT VARIOUS FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166 MOD 8: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSCL7C0014 INCORPORATE TN 7 MULTIPLE COMMUNICATIONS BUILDING ROOF REPAIRS;2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 2/28/2019. AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $104,959 FROM $3,397,297.74 TO$3,502,256.74. THE CONTRACT PERIOD OF PERFORMANCE;:E COMPLETION DATE IS CHANGED TO FEBRUARY28, 2019.
REPAIR ROOFS, VARIOUS FACILITIES MOD 7: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSCL7C0014 "REPLACE ROOFS AT VARIOUS FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166:
1. INCORPORATE TN 6 VAB HURRICANE IRMA REPAIRS;
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 1/24/2019.
AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $194,224 FROM $3,203,073.74 TO $3,397,297.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED TO JANUARY 24,
2019.
STATEMENT OF RELEASE: IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTE, AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING
OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS AGREEMENT.
IGF::OT::IGF CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. MOD 6: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSC L 7C00 14 "REPLACE ROOFS AT VARIOUS
FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166:
1. INCORPORATE 1N 5 NEWS CENTER ROOF AND WINDOWS DUE TO HURRICANE IRMA;
2. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED 12/13/2018.
THE PARTIES REACHED AGREEMENT ON TN 5 WHICH IS HEREBY INCORPORATED INTO THE CONTRACT AS
FOLLOWS: TN 5 NEWS CENTER ROOF AND WINDOWS WATER DAMAGE REPAIRS DUE TO HURRICANE IRMA $ 45,807 TOTAL $ 45,807
AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $45,807 FROM $3,157,266.74 TO $3,203,073.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED TO DECEMBER 13, 2018.
REPLACE ROOFS AT VARIOUS FACILITIES, REPLACE ROOF AT OSB II, PCNS: 99164&99166 MOD 5: 1. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSC 17C00 14:
1. INCORPORATE TN 4;
2. OSB II COMPLETION DATE CHANGED FROM JULY 17, 2018 TO JULY 31, 2018;
3. CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE REMAINS 11/22/2018.
AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY$ 10,000 FROM $3,147,266.74 TO $3,157,266.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE REMAINS NOVEMBER 22, 2018.
STATEMENT OF RELEASE: IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTE, AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS AGREEMENT.
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. MOD 4: THE PURPOSE OF THIS MODIFICATION IS TO SUPPLEMENT CLAUSE 52.232.27, PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS, WITH NFS CLAUSE 1852.232-80, SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (MAR 2018) (DEVIATION), AS INCORPORATED HEREIN. THIS MODIFICATION ALSO REMOVES HURRICANE MATTHEW FUNDS FOR TN'S 1 AND 2 AND REPLACE THEM WITH HURRICANE IRMA FUNDS.
CONSTRUCTION OF A TEMPORARY LAY DOWN AREA L7-0888, KENNEDY SPACE CENTER, FL MOD 1: THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL, WORK, FUNDING AND VALUE. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. MOD 3: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING INTO CONTRACT ORDER 80KSC017C0014 PCNS: 99164&99166:
1. INCORPORATE THE APPROVED SAFETY PLAN INTO THE CONTRACT;
2. INCORPORATE TNS 1 AND 2 AND DWS 1, 2 AND 3
3. ESTABLISHED PERIOD OF PERFORMANCE COMPLETION DATE OF 11/22/2018.
AS A RESULT OF THIS CHANGE, THE CONTRACT PRICE IS INCREASED BY $23,255 FROM $3,124,012.74 TO $3,147,267.74. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS NOVEMBER 22, 2018.
STATEMENT OF RELEASE: IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTE, AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING
OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS AGREEMENT.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 11: THE PURPOSE OF THIS MODIFICATION IS FOR A NO COST PERIOD OF PERFORMANCE EXTENSION OF 34 DAYS, FROM 1/19/18 TO 2/23/18 FOR COMPETION OF THE JAY JAY BRIDGE. THIS IS IN AGREEMENT WITH ICMI LETTER REQUEST DATED 1/16/18
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. MOD 2: THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD FUNDS TO OSB II. WHEN MODIFICATION #1 WAS PROCESSED $93,383.30 WAS DEOBLIGATED FROM OSB II INSTEAD OF SWAP OF FUNDS AND THIS MODIFICATION ADD THE FUNDS BACK. AS A RESULT OF THE FUNDING ACTION, THE FUNDING CONTRACT AMOUNT FOR OSB II IS CHANGED FROM $2,187,083.92 TO $2,285,457.22, WHICH THE CONTRACT AWARD AMOUNT.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 10: THE PURPOSE OF THIS MODIFICATION IS FOR A NO COST PERIOD OF PERFORMANCE EXTENSION OF 31 DAYS, FROM 11/17/2017 TO 1/19/2018 FOR COMPLETION OF THE JAY JAY BRIDGE. THIS IS IN AGREEMENT WITH ICMI LETTER REQUEST, DATED 12/20/17.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 9: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT AS FOLLOWS: A. INCORPORATE THE FOLLOWING TN CONTRACT CHANGE: TN-09, TO PROVIDE LABOR, EQUIPMENT, AND MATERIAL FOR BARGE TERMINAL VOIDS AT THE JAY JAY RAILROAD BRIDGE, IN THE AMOUNT OF $130,642 AS ATTACHMENT 1. AS A RESULT OF THE ABOVE CHANGE, THE CONTRACT PRICE IS INCREASED BY $130,642 FROM $2,478,656.72 TO $2,609,298.72. THE PERIOD OF PERFORMANCE IS REVISED FROM 01/05/2018 TO 02/09/2018.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 8: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT AS FOLLOWS:
A. INCORPORATE TN08 CONTRACT CHANGE
CONSTRUCT REPLACEMENT NASA CAUSEWAY DUCK BANK, EMERGENCY REPAIRS AND STABILIZATION TO DIRT ROAD AND WATER LINE FROM KARS PARK NORTH TO TEL IV. NET INCREASE OF $59,427.85. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $59,427.85, FROM $2,419,228.87 TO $2,478,656.72. THE PERIOD OF PERFORMANCE WILL BE EXTENDED FROM 12/08/2017 TO 01/05/2018.
B. STATEMENT OF RELEASE
IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CONTRACTOR'S TN08 AND THE EQUITABLE ADJUSTMENT ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE THESE PROPOSALS.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 7: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT AS FOLLOWS:
A. INCORPORATE TN07 CONTRACT CHANGE CONSTRUCT REPLACEMENT NASA CAUSEWAY DUCK BANK, EMERGENCY REPAIRS AND STABILIZATION TO AUDUBON ROAD AND ROADWAY SOUTH TO RADAR SITE TPQ18. NET INCREASE OF $249,751.47. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $249,751.47, FROM $2,169,477.40 TO $2,419,228.87. THE PERIOD OF PERFORMANCE IS EXTENDED FROM 11/17/2017 TO 12/8/2017.
B. STATEMENT OF RELEASE
IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CONTRACTOR'S TN07 AND THE EQUITABLE ADJUSTMENT ABOVE, THE CONTRACTOR HEREBY RELEASES
THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE THESE PROPOSALS.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK MOD 6: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT AS FOLLOWS: INCORPORATE TN06 CONTRACT CHANGE:
CONSTRUCT REPLACEMENT NASA CAUSEWAY DUCK BANK, EARTHWORK&CONCRETE REPAIRS AT THE JAY JAY BRIDGE, ADD ARMOR STONE. NET INCREASE OF $47,687.58. REQUEST FOR EQUITABLE ADJUSTMENT FOR ADDITIONAL LENGTH OF SHEET PILES AND BULKHEAD WALL DIMENSIONS. NET INCREASE OF $17,166.15. AS A RESULT OF THE ABOVE CHANGES, THE CONTRACT PRICE IS INCREASED BY $64,853.73, FROM $2,104,623.67 TO $2,169,477.40. THE PERIOD OF PERFORMANCE IS EXTENDED 59 DAYS, FROM 09/19/2017 TO 11/17/2017. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR THE CONTRACTOR'S TN06 AND THE EQUITABLE ADJUSTMENT ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY FOR FURTHER EQUITABLE ADJUSTMENT ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE THESE PROPOSALS.
CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA. MOD 1:
THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO SWAP FUNDS FOR OSB II AS SHOWN BELOW:
1. PR 4200623240 IN THE AMOUNT OF $93,383.30 IS DE-OBLIGATED FROM OSB II
2. PR 4200644365 IN THE AMOUNT OF $93,383.30 IS ADDED TO OSB II.
IGF::OT::IGF CONSTRUCTION CONTRACT FOR THE ROOF REPLACEMENT / REPAIRS FOR THE OPERATIONS SUPPORT BUILDING II (K6-1249), MULTIPURPOSE STORAGE FACILITY, FACILITY L6-0297, VEHICLE ASSEMBLY BUILDING (VAB) (K6-0848), AND BASE ELECTRIC SHOP, FACILITY K6-1446D AT KENNEDY SPACE CENTER, FLORIDA.
IGF::OT::IGF CONSTRUCT REPLACEMENT NASA CAUSEWAY COMMUNICATION DUCT BANK
MOD 5: THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS:
1) PROVIDED LABOR, MATERIAL AND EQUIPMENT TO STABILIZE EROSION DAMAGE THAT OCCURRED ON THE WEST SIDE OF THE BANANA RIVER BRIDGE APRON. THE DAMAGE IS LIMITED TO APPROXIMATELY 3' DEEP AND 5' X 5' OPENING (~3YDS) WEST OF THE STRUCTURAL CAP UN